A detailed explanation of the entire process of manufacturing spiral steel pipes.
2013-11-05
The entire process of making spiral steel pipes, materials, and some requirements before forming, along with a series of knowledge detailed introduction.Steel pipe的全过程,材料,还有成型前的一些要求,等一系列的知识详细介绍。
(1) Raw materials include steel strip coils, welding wire, and flux. They must undergo strict physical and chemical testing before use.
(2) The ends of the steel strip are butt-welded using single or double wire submerged arc welding, and after coiling, automatic submerged arc welding is used for repair.Steel pipe后采用自动埋弧焊补焊。
(3) Before forming, the steel strip undergoes leveling, edge trimming, planing, surface cleaning transport, and pre-bending edge treatment.
(4) The pressure of the oil cylinders on both sides of the conveyor is controlled by an electric contact pressure gauge to ensure stable transport of the steel strip.
(5) External control or internal control roller forming is used.
(6) A weld gap control device is used to ensure that the weld gap meets welding requirements; pipe diameter, misalignment amount, and weld gap are all strictly controlled.
(7) Both internal and external welding use American Lincoln welding machines for single or double wire submerged arc welding to achieve stable welding specifications.
(8) The welded seams are inspected by an online continuous ultrasonic automatic flaw detection instrument to ensure a 100% coverage rate for non-destructive testing of spiral welds. If defects are found, an automatic alarm is triggered and marked for correction; workers can adjust process parameters at any time to eliminate defects promptly.
(9) An air plasma cutting machine is used to cut into single pieces.Steel pipe切成单根。
(10) After cutting into single piecesSteel pipe后,每批Steel pipe, each batch's first three pieces must undergo strict initial inspection procedures to check mechanical properties of the welds, chemical composition, fusion conditions,Steel pipe, surface quality as well as non-destructive testing inspections. Only after ensuring that the pipe-making process meets standards can production officially commence.
(11) Areas with continuous ultrasonic flaw detection markings on the welds undergo manual ultrasonic and X-ray re-inspection. If defects are confirmed, they are repaired and subjected to non-destructive testing again until it is confirmed that defects have been eliminated.
(12) The butt-welded seams of the steel strip and the T-joints intersecting with spiral seams in pipes all undergo X-ray television or film inspection.
(13) Each pieceSteel pipe, after static water pressure testing where pressure uses radial sealing. The test pressure and time are strictly controlled by a water pressure microcomputer detection device. Test parameters are automatically printed for record-keeping.Steel pipe水压微机检测装置严格控制。试验参数自动打印记录。